For the last 3 weeks, we have been one of the parties that assisted MGL Demolition, acting as Structural Engineers, for the safe demolition of the Blender Bunkers & Part Conveyors at the Teesworks Site in Redcar. The works were part of the clearance of a section of land/equipment for future development proposals. Our role included the following:

– Production of a pre-demolition structural report

– Reviewing the pre-weakening of the structure

– Assessing the wind loads applied to the structure during the pre-weakened state

– Assessing the blowdown sequence of operations

– Assisting with the theory associated with the demolition technique

– Production of CAT 3 set of calculations