DEMOLITION TEMPORARY WORKS AND DESIGN REVIEWS.
DEMOLITION TEMPORARY WORKS AND DESIGN REVIEWS. We have been assisting MGL with their demolition process at the Swallow Hotel in Stockton On Tees. Planning and design have been paramount to enable the structures that are to be decommissioned to be taken down in a safe and systematic manner. Our works have included exposing the existing …