Case Study

  • Blowdown

    STRUCTURAL DEMOLITION ASSESSMENT 

    STRUCTURAL DEMOLITION ASSESSMENT – BLOWDOWN We were thanked by our client MGL Demolition for our assistance as acting Structural Engineers for the safe demolition of the Surge Bunkers at the Teesworks Site in Redcar. The works were part of the clearance of a section of land/equipment for future development proposals. Our role included the following: –…

    Read more: STRUCTURAL DEMOLITION ASSESSMENT 
  • DDM design assessment

    DDM Design Assessment

    We were not the designers for this chimney collapse mechanism – but we assisted DDM in the design assessment and reviewing of the pre-weakening works, the wind load capacity of the pre-weakened stacks, the proposed failure of the rear tags after detonation and the proposed drop zone once the explosives had done their work! Good planning…

    Read more: DDM Design Assessment
  • Demolition in Newcastle

    DEMOLITION CENTRAL NEWCASTLE – PILGRIMS QUARTER:

    We were appointed by MGL to assist with their demolition proposals and undertake a review of their RAMS for this prestigious project in Newcastle. The building to be demolished was landlocked and a facade retention scheme was required. In addition to this, we provided calculations for a number of their activities which allowed them to…

    Read more: DEMOLITION CENTRAL NEWCASTLE – PILGRIMS QUARTER:
  • Barn Conversion

    BARN CONVERSION – STRUCTURAL ASSESSMENT.

    BARN CONVERSION – STRUCTURAL ASSESSMENT. We have reviewed a number of barns on this site for conversion into residential units and the structural repairs that need to be undertaken for the refurbishment works associated with the project. Lots of challenges arise and all of them appear to be able to be resolved whilst ensuring any…

    Read more: BARN CONVERSION – STRUCTURAL ASSESSMENT.
  • Swallow Hotel

    DEMOLITION TEMPORARY WORKS AND DESIGN REVIEWS.

    DEMOLITION TEMPORARY WORKS AND DESIGN REVIEWS. We have been assisting MGL with their demolition process at the Swallow Hotel in Stockton On Tees. Planning and design have been paramount to enable the structures that are to be decommissioned to be taken down in a safe and systematic manner. Our works have included exposing the existing…

    Read more: DEMOLITION TEMPORARY WORKS AND DESIGN REVIEWS.
  • Flare stack

    STRUCTURAL ASSESSMENT – RE-FLARE STACK DEMOLITION

    STRUCTURAL ASSESSMENT – RE-FLARE STACK DEMOLITION. We were appointed to assess the safe deconstruction of a number of flares stacks at Teesside. This included a load assessment, cut and tag locations, rope pull sizes and production of calculations for our client. Scurator Ltd is a multi-disciplinary organisation specialising in providing total engineering solutions to a…

    Read more: STRUCTURAL ASSESSMENT – RE-FLARE STACK DEMOLITION
  • Oil Rig | Demolition

    Oil Rig Demolition

    DEMOLITION CONSULTANTS – BRENT SHELL OIL RIG – DEMOLITION – HARTLEPOOL. Scurator were very privileged to be appointed to act as the consulting engineers for ABLE UK at their Seal Sands Dock. The role involved acting as the demolition design consulting engineers to undertake the following works: All the calculations were checked by a third…

    Read more: Oil Rig Demolition
Scroll to Top